All news

Bulgaria supports South Stream construction, foreign minister says

Earlier, Russia’s Minister of Foreign Affairs Sergei Lavrov said that Russia and Bulgaria emphasized the need to build South Stream on schedule time
Bulgaria's Foreign Minister Kristian Vigenin  EPA/TAMAS KOVACS
Bulgaria's Foreign Minister Kristian Vigenin
© EPA/TAMAS KOVACS
THE SOUTH STREAM PROJECT

Gazprom’s $45 billion South Stream project, slated to open in 2018 and deliver 64 billion cubic meters of natural gas to Europe, is a strategy for Russia to bypass politically unstable Ukraine as a transit country, and helps ensure the reliability of gas supplies to Europe.

The project stipulates for the offshore gas pipeline section to run under the Black Sea from the Russkaya compressor station on the Russian coast to the Bulgarian coast. The total length of the offshore section will be around 900 kilometers, the maximum depth - over two kilometers and the design capacity — 63 billion cubic meters. There are two optional routes for the onshore gas pipeline section: either north-westwards or south-westwards from Bulgaria.

The 900-kilometer-long undersea section of the pipeline will run from the gas compressor facility at Beregovaya, on Russia's Black Sea coast, near Arkhipo-Osipovka, towards the city of Burgas, in Bulgaria. The sea's maximum depth on this route is 2,000 meters.

South Stream is a strategic project for Europe's energy security and should be implemented by the end of 2015. Work is currently underway to draft a feasibility study for the marine section across the Black Sea and the surface section running through transit countries.

The overall capacity of the marine section of the pipeline will be 63 billion cubic meters per year. It is worth about €8.6 billion.

Continue